Video of water streaming into a storage room which flooded the Mora High School basement. The gym roofs were not designed for water not to flow off of them and away from the building. Instead, rain and spring melt flow from the roofs toward the center of the building, into a pipe the flows down through the center of the building and into a storm-water drain. On March 13, 2019, this pipe got blocked with ice, melting snow built up and leaked into the building.

(0) comments

Welcome to the discussion.

Keep it Clean. Please avoid obscene, vulgar, lewd, racist or sexually-oriented language.
PLEASE TURN OFF YOUR CAPS LOCK.
Don't Threaten. Threats of harming another person will not be tolerated.
Be Truthful. Don't knowingly lie about anyone or anything.
Be Nice. No racism, sexism or any sort of -ism that is degrading to another person.
Be Proactive. Use the 'Report' link on each comment to let us know of abusive posts.
Share with Us. We'd love to hear eyewitness accounts, the history behind an article.